/

Water Details

Standard Underground Meter Installation Fire Hydrant Assembly
1″ Underground Meter Installation Dead End Blowoff Assembly
1″ thru 2″ Above Ground Meter Installation Dead End Blowoff Assembly w/ Possible Main Extension
3″ & Greater Above Ground Meter Installation Temporary Sample Point at Blowoff Assembly
3″ & Above Fire Line Assembly Road Crossing
Backflow Prevention Assembly Small Temporary Water Meter Assembly
Large Temporary Water Meter Assembly

 

Gravity Sewer Details

Standard Manhole Lift Station
Drop Manhole Lift Station Electrical Panel Layout
Manhole Frame & Cover Lift Station Control Panel Layout
Single Service to Main RTU Antenna
Double Service to Main Low Pressure System & Tank Unit
Manual Air Release

 

 

Vacuum Sewer Details

General Notes Branch Connections
Vacuum Valve Pit Assembly Branch Connections Alternate
Vacuum Valve Pit 6″ Air Intake & Vent Change in Direction & Lift
Vacuum Valve Pit Bedding Vacuum Main Cleanout in Pavement
Vacuum Valve Pit Pre & Post Customer Connection Vacuum Main Cleanout Not in Pavement
Vacuum Valve Pit Narrow ROW Vacuum Gauge Tap

 

Other Details

2″ Threaded Valve Service Tap Trench
Tapping Sleeve & Valve Locator Device
Gate Valve Main Adjustment
Plug Valve Main Relocation
Butterfly Valve Main Crossing
Valve Pad Replacement of Concrete Driveway
Steel Casing Flexible Pavement Restoration – Sarasota County
Restrained Joints Flexible Pavement Restoration – Charlotte County
Pressure Test Gauge Assembly